5S MANAGEMENT

1s 2s Audit Checklist | 1s 2s Audit Check Sheet

5S is an improvement process to eliminate waste that originates from a poorly organized workplace/area. It is the basic tool and foundation stone of Lean manufacturing, TPM, TQM, or any organizational process improvement activity. Without 5S practice, an organization cannot succeed in improving the product & process quality. This article lists 1S, 2S, and 3S audit points along with 1S 2S audit checklist sample.

  1. Seiri or Sorting out
  2. Seiton or Set in Order or Organize
  3. Seiso or Shine or Sweep
  4. Seiketsu or Standardize
  5. Shitsuke or Sustain or Self Discipline

1S Meaning: Seiri – Sorting Out (Disposal of unwanted items)

It helps to segregate necessary & unnecessary items and eliminates unwanted items.

  1. Unwanted (unidentified) items not to be on the Floor (a scrap of paper, tools, parts, bins, chips, oil, etc.).  Nothing on the top of the rack, under the table, under/behind the machine, between the Machines & similar places, etc.
  2. Disposal System: Old drums, Grinding Sludge, Paint Sludge, used oil, used consumables, Welding rods, cutting tools, electric wires, R/M end pieces, Scrap, Hazardous waste, etc. are disposed off at regular intervals.
  3. No storage of unused/ excess parts like raw material, bought-out parts, finished goods, etc., Hold material waiting for decision (rejection, rework).
  4. No storage of old machines, equipment, old standards (not in use), old drawings/parts/documents (obsolete), not-in-use items like old furniture, old racks, material handling equipment, old equipment, or utility items inside the factory premise.
  5. No mix-up of different types of parts, No mix-up of OK (wanted), Rejected (unwanted) Parts, Rusty & dusty material, no broken bins, hardware/tools mixing, machine accessories, maintenance spares, Red bins on all machines & daily clearance.

1s audit checklist with scoring criteria:

2S Meaning: Seiton – Set in Order – Organize – Systematic Arrangement

This step essentially means arranging items in a systematic way, for easy accessibility and using them in the best order.

  1. “There is a place for everything & everything is in its place”. Locations for the storage of the parts, Documents, tools, equipment / Machine & spares, etc. are clearly defined with Visuals. Route card & Identification tags on all Parts.
  2. Bin/parts Arrangement in bin & trolleys etc. (No zig-zag placing & no different type of bins each other inside / Top). The right component in the right containers/pallets/ Bins/ Trolleys etc.
  3. Gangways are clearly marked (no zig-zag movement of man & material),  Gangways & Jogging track (wall side) are free of material/bins, Outside area should be clear, no jam. trolleys, bins, parts etc.
  4. Availability of Work Standard/Control plan & PFD, Daily machine check sheet, setup approval part availability,  in-process report, WI, Gauges, Machine data sheet, and data display boards are available & updated.
  5. 5S zones are marked, roles and responsibilities are defined, and zone-specified documents (1S/2S score, Skill matrix, Safety chart, etc.) are updated and maintained.

2s audit checklist with scoring criteria:

3S Meaning: Seiso – Shine – Sweep (Shine everything-cleaning.)

This step makes the workplace neat & clean by eliminating dirt, dust & other foreign matter.

  1. Almirah, racks drawers, cupboards,  tables, fans, and lights are visible and clean, window glass, machines, machines spares, Jig/Fixture, Tools/Dies, and Containers/pallets are clean and free from damage.
  2. No documents are pasted on walls, glasses, or machines. No gum/tape adhesive marks on glasses, walls & machines.
  3. Machines are Clean & Clear (scrap, leakages of water, oil, gas, air, coolant, etc.). Machine CLIT activities are done as per the daily machine checklist, material handling equipment is clean, Jigs & Fixtures, and Gauges are clean, and free from dust & damage.

3s audit checklist with scoring criteria:

  1. PPEs Use ( Shoes, Gloves, Goggles etc.). No Floor damage or fire extinguishers are available.
  2. No Loose Wiring & Pipe.
  3. No M/C cover & panel open.
  4. Safety guard on moving parts.

Published by
TQP

Recent Posts

  • AFFILIATE MARKETING

Digital Academy Fortune Review | Set Up Your Digital Academy Website in Minutes

Digital Academy Fortune’ Takes Your Online Business to A New Level. Launch Your Own Professional Digital… Read More

February 19, 2026
  • LEAN MANUFACTURING

Design for Manufacturing in Modern Mechanical Engineering

Nowadays machines need to work right the first time. Teams building them face tough demands… Read More

January 8, 2026
  • QUALITY MANAGEMENT

Management Responsibilities | QMS

It is top management's responsibility to establish a effective Quality Management System within the organization.… Read More

November 21, 2025
  • EHS MANAGEMENT

Environmental Audit Checklist | Environmental Compliance Audit Report

For auditing the environmental management system, following key checkpoints or requirement must be addressed in… Read More

September 1, 2025
  • LEAN MANUFACTURING

Why Focus is the New Productivity Metric in Industrial Workspaces

For years, industrial and manufacturing productivity was about how much you produce and how fast… Read More

July 24, 2025
  • QUALITY MANAGEMENT

CQI-27 | Casting System Assessment

Introduction | CQI-27 The work of preparing CQI-27 Special Process: Casting System Assessment was carried… Read More

July 7, 2025