Manufacturing Processes

4M Change Types | Engineering Changes | Reasons for Change

There are mainly two types of major changes occurred in manufacturing processes/industries.

  1. Permanent Change – For Example ECN/PCN Change
  2. Temporary Change – For Example 4M Change

4M Change types are:

  1. MAN CHANGE
  2. MACHINE/TOOL CHANGE
  3. METHOD CHANGE
  4. MATERIAL CHANGE
  • Skill level change
  • New Operator
  • Extra & Extended shift working
  • Contract manpower
  • Operator dominant process operator change 
  • Skill level change (Inspection & Critical Station)
  • Tool & Die change (new / duplication)
  • Machine change i.e. Change in Type, Capacity etc.
  • Production done after Tooling In-Active
  • Change in Die & Tool -core, cavity, insert, slider etc. (change in part feature)
  • Ejector pins, nipples & part non-feature segment change in tool.
  • Cavity, Jigs, Fixtures, tool segment increase
  • Cavity, Jigs, Fixtures, tool segment decrease
  • Change in Tray, Jig & Fixture
  • Soldering and conformal coating fixtures change
  • ICT & FCT fixtures / software change
  • Welding fixtures change
  • Removal / Addition of Poka-yoke
  • M/c parameter change & Process Parameter Change
  • Tool & Machine Accident
  • Power Source Changed
  • Machine internal change for same capacity
  • Process sequence change
  • Any temp deviation from Control Plan/PQCS
  • New Technology
  • Sub-process supplier change
  • Process Deletion, Merging, Elimination, Additional
  • Bin/Trolley (WIP/Storage/Dispatch)
  • Packaging change
  • Traceability (Batch Code) marking Change
  • Limit Sample Change
  • Transportation mode change
  • Number of material handling
  • Traceability (Batch code) marking change
  • Inspection marking change
  • Inspection method, Frequency & Equipment
  • Raw material size / thickness / weight change
  • Different raw material approved supplier
  • Different spec / grade
  • Different raw material unapproved supplier
  • Change in Consumables i.e. Oil, Grease, Flux , Solder Paste, etc.
  • Child-part change (Machine)
  • Child-part change(Method)
  • Child-part change (Supplier)
  • Child-part change (Material)
  • Customer requested engineering changes
  • Internal Change request affecting customer fit / function
  • Internal Change request affecting customer Appearance
  • Internal Change request affecting product life cycle
  • Internal Change request not affecting customer Fit/Function/Appearance/Life cycle – For facilitating Rejection reduction, Poka-Yoke, Ease of inspection, productivity improvement, and Assembly process.
  • Tool Transfer Inhouse
  • Process Transfer to other location (Inhouse)
  • New location / layout change
  • Work station change
  • Re-located after 6 months
  • Change can affect the legal requirements and Environment
  • Customer requirements
  • Warranty complaints
  • In-house complaints
  • Productivity improvement
  • New or Modified Tools, Dies, Molds. etc.
  • Die/Tool transferred
  • Refurbishment or Rearrangement of existing tooling or equipment
  • Change in test / inspection method
  • Change in process flow / method that impact fit, function, form performance and durability
  • Identical gauge replacement.
  • Assembly line shifted from one plant to another.
  • Missing cavity in regular production
  • Product produced after the tooling has been inactive for volume production for 12 months or more

Following document are generally submitted to customer (as per requirement & applicability) against the 4M Change or any Engineering Change:

  • Setup approval report
  • Material/part Inspection report
  • Part Submission Warrant
  • Material/Performance Test Results
  • Appearance Approval Report (AAR)
  • Master Sample – To be identified and retained by the supplier
  • Process Flow Diagram
  • Measurement System Analysis studies (MSA)- e.g. Gage R&R for all measuring instruments used in part inspection as per control plan. Sample Inspection (Dimensional) Report
  • Calibration Plan
  • Preventive Maintenance Plan
  • Control Plan/PQCS/Work Standard
  • Process Failure Mode and Effects Analysis (PFMEA)
  • Records of Compliance to Customer-Specific Requirements
  • Qualified Laboratory Documentation
Published by
TQP

Recent Posts

  • AFFILIATE MARKETING

Digital Academy Fortune Review | Set Up Your Digital Academy Website in Minutes

Digital Academy Fortune’ Takes Your Online Business to A New Level. Launch Your Own Professional Digital… Read More

February 19, 2026
  • LEAN MANUFACTURING

Design for Manufacturing in Modern Mechanical Engineering

Nowadays machines need to work right the first time. Teams building them face tough demands… Read More

January 8, 2026
  • QUALITY MANAGEMENT

Management Responsibilities | QMS

It is top management's responsibility to establish a effective Quality Management System within the organization.… Read More

November 21, 2025
  • EHS MANAGEMENT

Environmental Audit Checklist | Environmental Compliance Audit Report

For auditing the environmental management system, following key checkpoints or requirement must be addressed in… Read More

September 1, 2025
  • LEAN MANUFACTURING

Why Focus is the New Productivity Metric in Industrial Workspaces

For years, industrial and manufacturing productivity was about how much you produce and how fast… Read More

July 24, 2025
  • QUALITY MANAGEMENT

CQI-27 | Casting System Assessment

Introduction | CQI-27 The work of preparing CQI-27 Special Process: Casting System Assessment was carried… Read More

July 7, 2025