Manufacturing Processes
4M Change Types | Engineering Changes | Reasons for Change
There are mainly two types of major changes occurred in manufacturing processes/industries.
- Permanent Change – For Example ECN/PCN Change
- Temporary Change – For Example 4M Change
4M CHANGE TYPES
4M Change types are:
- MAN CHANGE
- MACHINE/TOOL CHANGE
- METHOD CHANGE
- MATERIAL CHANGE
CHANGE RELATED TO “MAN”
- Skill level change
- New Operator
- Extra & Extended shift working
- Contract manpower
- Operator dominant process operator change
- Skill level change (Inspection & Critical Station)
CHANGE RELATED TO “MACHINE”
- Tool & Die change (new / duplication)
- Machine change i.e. Change in Type, Capacity etc.
- Production done after Tooling In-Active
- Change in Die & Tool -core, cavity, insert, slider etc. (change in part feature)
- Ejector pins, nipples & part non-feature segment change in tool.
- Cavity, Jigs, Fixtures, tool segment increase
- Cavity, Jigs, Fixtures, tool segment decrease
- Change in Tray, Jig & Fixture
- Soldering and conformal coating fixtures change
- ICT & FCT fixtures / software change
- Welding fixtures change
- Removal / Addition of Poka-yoke
- M/c parameter change & Process Parameter Change
- Tool & Machine Accident
- Power Source Changed
- Machine internal change for same capacity
CHANGE RELATED TO “METHOD”
- Process sequence change
- Any temp deviation from Control Plan/PQCS
- New Technology
- Sub-process supplier change
- Process Deletion, Merging, Elimination, Additional
- Bin/Trolley (WIP/Storage/Dispatch)
- Packaging change
- Traceability (Batch Code) marking Change
- Limit Sample Change
- Transportation mode change
- Number of material handling
- Traceability (Batch code) marking change
- Inspection marking change
- Inspection method, Frequency & Equipment
CHANGE RELATED TO “METERIAL”
- Raw material size / thickness / weight change
- Different raw material approved supplier
- Different spec / grade
- Different raw material unapproved supplier
- Change in Consumables i.e. Oil, Grease, Flux , Solder Paste, etc.
- Child-part change (Machine)
- Child-part change(Method)
- Child-part change (Supplier)
- Child-part change (Material)
ENGINEERING CHANGES
- Customer requested engineering changes
- Internal Change request affecting customer fit / function
- Internal Change request affecting customer Appearance
- Internal Change request affecting product life cycle
- Internal Change request not affecting customer Fit/Function/Appearance/Life cycle – For facilitating Rejection reduction, Poka-Yoke, Ease of inspection, productivity improvement, and Assembly process.
MANUFACTURING LOCATION CHANGE
- Tool Transfer Inhouse
- Process Transfer to other location (Inhouse)
- New location / layout change
- Work station change
- Re-located after 6 months
- Change can affect the legal requirements and Environment
REASONS FOR CHANGES
- Customer requirements
- Warranty complaints
- In-house complaints
- Productivity improvement
- New or Modified Tools, Dies, Molds. etc.
- Die/Tool transferred
- Refurbishment or Rearrangement of existing tooling or equipment
- Change in test / inspection method
- Change in process flow / method that impact fit, function, form performance and durability
- Identical gauge replacement.
- Assembly line shifted from one plant to another.
- Missing cavity in regular production
- Product produced after the tooling has been inactive for volume production for 12 months or more
DOCUMENTS SUBMISSION AGAINST 4M CHANGE
Following document are generally submitted to customer (as per requirement & applicability) against the 4M Change or any Engineering Change:
- Setup approval report
- Material/part Inspection report
- Part Submission Warrant
- Material/Performance Test Results
- Appearance Approval Report (AAR)
- Master Sample – To be identified and retained by the supplier
- Process Flow Diagram
- Measurement System Analysis studies (MSA)- e.g. Gage R&R for all measuring instruments used in part inspection as per control plan. Sample Inspection (Dimensional) Report
- Calibration Plan
- Preventive Maintenance Plan
- Control Plan/PQCS/Work Standard
- Process Failure Mode and Effects Analysis (PFMEA)
- Records of Compliance to Customer-Specific Requirements
- Qualified Laboratory Documentation
Recent Posts
Digital Academy Fortune’ Takes Your Online Business to A New Level. Launch Your Own Professional Digital… Read More
Nowadays machines need to work right the first time. Teams building them face tough demands… Read More
It is top management's responsibility to establish a effective Quality Management System within the organization.… Read More
For auditing the environmental management system, following key checkpoints or requirement must be addressed in… Read More
For years, industrial and manufacturing productivity was about how much you produce and how fast… Read More
Introduction | CQI-27 The work of preparing CQI-27 Special Process: Casting System Assessment was carried… Read More