3M is a Japanese concept derived to identify and eliminate non-value-added activities present in the manufacturing process. 7 types of waste in Lean manufacturing are comes under Muda.
3M Waste are Muda, Mura and Muri.
It is called 3M since the first letter starts with “M”.
These are the three major waste that is firstly identified by Toyota Production system-TPS
3M Waste are:
MUDA stands for eliminating waste or non-value-added activities from the manufacturing process. It can be anything that does not add value from the customer’s point of view.
There are 7 types of MUDA or 7 types of Waste identified in the lean manufacturing process which is as follow:
>Click the link to explore the “7 types of waste.” How to reduce waste in Lean Manufacturing?
Two things or activities that have large variation result in losses thereby increase the cost of operation. The Losses can be reduced by balancing or reducing Variation.
e.g. Allocation of unequal work to operators.
Countermeasure: Share workload to operators, Line balancing, Match skill of persons.
MURI stands for any activity that exceeds the capacity of 4M (man, machine, method, and material) against the actual requirement.
This is the excessive burden/load/stress that we create on machines, vehicles, and employees due to lack of knowledge, poor work instructions/practices.
e.g. Truck of 4 Ton capacity carrying 6 Ton material. Strain due to poor design, Operator getting over-tired by working in strained posture, Increased workload due to shortage/non-availability of manpower.
Countermeasure: Follow Ergonomics on workplace-minimum arms movement, head movement, and body movement, Follow standard operating system-SOPs.
Digital Academy Fortune’ Takes Your Online Business to A New Level. Launch Your Own Professional Digital… Read More
Nowadays machines need to work right the first time. Teams building them face tough demands… Read More
It is top management's responsibility to establish a effective Quality Management System within the organization.… Read More
For auditing the environmental management system, following key checkpoints or requirement must be addressed in… Read More
For years, industrial and manufacturing productivity was about how much you produce and how fast… Read More
Introduction | CQI-27 The work of preparing CQI-27 Special Process: Casting System Assessment was carried… Read More