The Control Plan is a written document that describes the methods & processes needed for controlling the manufacturing of products (starting from raw material procurement to finished product shipment).
The Control Plan Quality gives the operator or inspector the knowledge necessary for proper process control and the production of high-quality components or products.
A Control Plan is one of the important documents of the Production Part and Approval Process (PPAP).
Process Flow Chart (PFC) & Process Failure Mode Effect Analysis (PFMEA) are the most important documents/elements of PPAP, and both are the direct source of inputs for making the control plan.
It is very important to note that the process/operation sequence number of the control plan should be aligned with the PFC & PFMEA sequence number.
Control Plan is a living document that should be periodically reviewed & updated for the following cases:
Table of Contents
Definition as per IATF 16949: Control Plan is the documented description of the systems and processes required for controlling the manufacturing of products.
A control plan is prepared in three phases:
Prototype Control Plan: Prototype control is a description of dimensional measurements, material, and performance tests that will occur during prototype development. The organization shall have a prototype control plan if required by the customer.
Pre-launch Control Plan: Pre-launch control plan is a description of dimension measurements, materials, and performance tests that occur after the completion of prototype phase and before regular production begins.
Pre-launch is defined as a production phase in the process of product realization that may be required after prototype build.
Production Control Plan: This level of control plan includes a complete listing of the product and process characteristics, the process controls, tests, and measurement systems that occur during mass production or routine production.
A control plan quality format includes the following general data/contents/elements:
The organization shall address the following key points while making the control plan for the manufacturing of quality products:
Digital Academy Fortune’ Takes Your Online Business to A New Level. Launch Your Own Professional Digital… Read More
Nowadays machines need to work right the first time. Teams building them face tough demands… Read More
It is top management's responsibility to establish a effective Quality Management System within the organization.… Read More
For auditing the environmental management system, following key checkpoints or requirement must be addressed in… Read More
For years, industrial and manufacturing productivity was about how much you produce and how fast… Read More
Introduction | CQI-27 The work of preparing CQI-27 Special Process: Casting System Assessment was carried… Read More