Manufacturing Processes

Welding Fixture PM Check List | Welding Fixture PM Check Sheet

All welding fixtures should be inspected as per PM plan and Welding Fixture PM Check List, and maintain proper maintenance records.

Welding Jig/Fixture Maintenance content includes the following:

  • Whether the positioning pin is firm, whether it is bent or deformed, whether the positioning pin wear amount is too large, and whether the diameter of the general positioning pin and workpiece hole is not more than 0.10mm.
  • Whether the positioning block is firm or not and whether the positioning surface is worn is not more than 0.2 mm.
  • Whether pressure pillars can be reliably pressed, and the head wear is serious. If the head area is too small and the workpiece is pressed out of the pit, it must be grounded or replaced.
  • Whether the bolts of the connecting parts are tightened securely or not, and whether the solder joints are fixed at the spot welding are cracked.
  • Check whether the chute positioning is reliable and whether it moves freely.
  • Whether the components of the pneumatic clamp are damaged, whether the cylinder and the pipeline leak, and whether the clamping mechanism is reliable.
  • Whether the marking of welding automobile fixtures is clear.

In addition to copper positioning pins, other steel positioning pins must be heat-treated during replacement to increase wear resistance. Drawings require heat treatment when the heat-treated positioning block is replaced.

Welding Fixture Preventive Maintenance Check Sheet

  • Fixture Cleaning
  • Locating Pins and Bushes
  • Rest Mylar
  • Clamp Mylar
  • Blocks
  • LM Guides
  • Filter, Regulator & Lubricator
  • Base Plate
  • Pneumatic Tubing & Fitting
  • Tooling Hole
  • Poka-Yoke
  • Standard SIM
  • Toggle clamps
  • Pneumatic Cylinder
  • Magnet condition
  • Part Inspection and validation

Welding Fixture Preventive Maintenance Checklist | Control points with control standard checking frequency:

Control PointControl StandardChecking frequency
Fixture CleaningNo spatter, Rust, other Contaminants etc.Daily & Every Three Month
No spatter, Rust, other Contaminants, etc.Pin diameter and Visual condition for bend, damageDaily & Every Three Month
Rest & Clamp MylarNo loose, broken, play and wear outEvery Three month
BlocksNo loose, broken, play and wear outEvery Three month
LM GuidesEasily sliding, and No play and looseEvery Three month
FRL UnitShould be clean and spatter-freeEvery Three month
Base PlateLocating pins and bushesDaily & Every Three Month
Pneumatic tubing & fittingNo Cut Spatter, Leakage & Anti spatter TubeEvery Three Month
Tooling HoleNo hole blockEvery Three Month
Poka-YokeMust be workingDaily & Every Three Month
Standard SIMOnly standard sim usedEvery Three Month
Toggle clampsNo play, clamp force, LooseDaily & Every Three Month
Pneumatic CylinderNo leakage, no part loose after clampingDaily & Every Three Month
Magnet ConditionShould be available and working conditionDaily & Every Three Month
Inspection & ValidationAs per drawingEvery Three Month
Copper coating sprayShould be availableEvery Three Month

Point to remember – Part must be replaced in case of any abnormality found during checking and Checking frequency can be reduced or increased based on production volume.

Location pinsCopper BlocksPneumatic pipe
Shims
ConnectorsSensor Sleeve
MylarsReed SwitchesEnd caps
Hex-BoltsProximity sensorsFRL Units
DowelElectrical wiringsTooling hole covers
L-B01tsPneumatic ValvesCylinder covers
WashersCylindersHand Lever
V-GuidesSensor CapsPU block/Teflon
StoppersSensor SleevesCable ties
Poka-Yoke PinCylinder coversKnuckle pin
Rough GuidePush buttons
Published by
TQP

Recent Posts

  • AFFILIATE MARKETING

Digital Academy Fortune Review | Set Up Your Digital Academy Website in Minutes

Digital Academy Fortune’ Takes Your Online Business to A New Level. Launch Your Own Professional Digital… Read More

February 19, 2026
  • LEAN MANUFACTURING

Design for Manufacturing in Modern Mechanical Engineering

Nowadays machines need to work right the first time. Teams building them face tough demands… Read More

January 8, 2026
  • QUALITY MANAGEMENT

Management Responsibilities | QMS

It is top management's responsibility to establish a effective Quality Management System within the organization.… Read More

November 21, 2025
  • EHS MANAGEMENT

Environmental Audit Checklist | Environmental Compliance Audit Report

For auditing the environmental management system, following key checkpoints or requirement must be addressed in… Read More

September 1, 2025
  • LEAN MANUFACTURING

Why Focus is the New Productivity Metric in Industrial Workspaces

For years, industrial and manufacturing productivity was about how much you produce and how fast… Read More

July 24, 2025
  • QUALITY MANAGEMENT

CQI-27 | Casting System Assessment

Introduction | CQI-27 The work of preparing CQI-27 Special Process: Casting System Assessment was carried… Read More

July 7, 2025