All welding fixtures should be inspected as per PM plan and Welding Fixture PM Check List, and maintain proper maintenance records.
Welding Jig/Fixture Maintenance content includes the following:
In addition to copper positioning pins, other steel positioning pins must be heat-treated during replacement to increase wear resistance. Drawings require heat treatment when the heat-treated positioning block is replaced.
Table of Contents
Welding Fixture Preventive Maintenance Checklist | Control points with control standard checking frequency:
| Control Point | Control Standard | Checking frequency |
| Fixture Cleaning | No spatter, Rust, other Contaminants etc. | Daily & Every Three Month |
| No spatter, Rust, other Contaminants, etc. | Pin diameter and Visual condition for bend, damage | Daily & Every Three Month |
| Rest & Clamp Mylar | No loose, broken, play and wear out | Every Three month |
| Blocks | No loose, broken, play and wear out | Every Three month |
| LM Guides | Easily sliding, and No play and loose | Every Three month |
| FRL Unit | Should be clean and spatter-free | Every Three month |
| Base Plate | Locating pins and bushes | Daily & Every Three Month |
| Pneumatic tubing & fitting | No Cut Spatter, Leakage & Anti spatter Tube | Every Three Month |
| Tooling Hole | No hole block | Every Three Month |
| Poka-Yoke | Must be working | Daily & Every Three Month |
| Standard SIM | Only standard sim used | Every Three Month |
| Toggle clamps | No play, clamp force, Loose | Daily & Every Three Month |
| Pneumatic Cylinder | No leakage, no part loose after clamping | Daily & Every Three Month |
| Magnet Condition | Should be available and working condition | Daily & Every Three Month |
| Inspection & Validation | As per drawing | Every Three Month |
| Copper coating spray | Should be available | Every Three Month |
Point to remember – Part must be replaced in case of any abnormality found during checking and Checking frequency can be reduced or increased based on production volume.
| Location pins | Copper Blocks | Pneumatic pipe |
| Shims | Connectors | Sensor Sleeve |
| Mylars | Reed Switches | End caps |
| Hex-Bolts | Proximity sensors | FRL Units |
| Dowel | Electrical wirings | Tooling hole covers |
| L-B01ts | Pneumatic Valves | Cylinder covers |
| Washers | Cylinders | Hand Lever |
| V-Guides | Sensor Caps | PU block/Teflon |
| Stoppers | Sensor Sleeves | Cable ties |
| Poka-Yoke Pin | Cylinder covers | Knuckle pin |
| Rough Guide | Push buttons |
Digital Academy Fortune’ Takes Your Online Business to A New Level. Launch Your Own Professional Digital… Read More
Nowadays machines need to work right the first time. Teams building them face tough demands… Read More
It is top management's responsibility to establish a effective Quality Management System within the organization.… Read More
For auditing the environmental management system, following key checkpoints or requirement must be addressed in… Read More
For years, industrial and manufacturing productivity was about how much you produce and how fast… Read More
Introduction | CQI-27 The work of preparing CQI-27 Special Process: Casting System Assessment was carried… Read More