Welding Fixture PM Check List | Welding Fixture PM Check Sheet

All welding fixtures should be inspected as per PM plan and Welding Fixture PM Check List, and maintain proper maintenance records. Welding Jig/Fixture Maintenance content includes the following: In addition to copper positioning pins, other steel positioning pins must be heat-treated during replacement to increase wear resistance. Drawings require heat treatment when the heat-treated positioning […]

Welding Fixture PM Check List | Welding Fixture PM Check Sheet Read More »

1s 2s Audit Checklist | 1s 2s Audit Check Sheet

5S is an improvement process to eliminate waste that originates from a poorly organized workplace/area. It is the basic tool and foundation stone of Lean manufacturing, TPM, TQM, or any organizational process improvement activity. Without 5S practice, an organization cannot succeed in improving the product & process quality. This article lists 1S, 2S, and 3S audit points along

1s 2s Audit Checklist | 1s 2s Audit Check Sheet Read More »

Manufacturing Process Audit Check Sheet

Manufacturing Process Audit Check Sheet points requirement as per IATF 16949 clause no. 9.2.2.3 are: The Manufacturing Process Audit Check Sheet points related to Man, Machine, Method & Material requirement are described below: MAN Related Check Points (Observe Machine Operator) MACHINE/EQUIPMENT Related Check Point (Observe Machine/Equipment/Tool/Jig/Fixture) MATERIAL Related Check Points (Observe – Material Flow/Condition) METHOD

Manufacturing Process Audit Check Sheet Read More »

Corporate Social Responsibility CSR | CSR Requirements

Corporate Social Responsibility-CSR is the mandatory customer requirement that is to be fulfilled by every supplier engaged in the field of automotive, manufacturing & service sectors. A company that practices corporate social responsibility makes a deliberate effort to conduct its operations in a way that benefits society and the environment rather than harming them. Corporate

Corporate Social Responsibility CSR | CSR Requirements Read More »

Persistent Organic Pollutants(POPs) & Phthalates

Introduction The substances mentioned below are restricted, under discussion for restriction or are proposed as Persistent Organic Pollutants(POPs) as per the Stockholm Convention, EU POPs Regulation and GADSL. Persistent Organic Pollutants(POPs) Persistent Organic Pollutants(POPs) are persistent, bio accumulative and toxic chemical substances which adversely affect the environment and human health. Phthalates Phthalates, a group of

Persistent Organic Pollutants(POPs) & Phthalates Read More »

Accident Definition | Accident Types | Safety Management

Accident Definition Accident Definition: Accident is an unplanned, unforeseen, undesired, non-value added, interrupting activity which may or  may not result in personal injury / property damages. Safety Definition Safety is prevention of accidents which results personal  injury and property damage. Safety Management Principle Cause of Accidents Unsafe Condition Working conditions/environment which are prone to have

Accident Definition | Accident Types | Safety Management Read More »

Safety Audit Checklist | Safety Audit Types | Safety Audit Sheet

What is Safety? Safety is prevention of accidents which results personal  injury and property damage. Safety in a industrial establishment is required to avoid any interruptions into all the below factors: Man, Machine, Material and Environment. Safety Management Principle Safety Audit Purpose Who Secure Safety ? Safety should be secured by all the members. Safety Audit Methodology

Safety Audit Checklist | Safety Audit Types | Safety Audit Sheet Read More »

CQI9 Audit Checklist | CQI9 Self Assessment Checklist | CQI9 4th Edition

What is CQI9 ? CQI-9, formally known as “CQI-9 Special Process: Heat Treat System  Assessment (HTSA),” is a standard developed by the Automotive Industry Action Group (AIAG). It is designed to ensure the consistency and reliability of heat treatment processes used in the manufacturing of automotive components. The HTSA is applicable to sites where customer-specified parts for

CQI9 Audit Checklist | CQI9 Self Assessment Checklist | CQI9 4th Edition Read More »

4M Change Types | Engineering Changes | Reasons for Change

There are mainly two types of major changes occurred in manufacturing processes/industries. 4M CHANGE TYPES 4M Change types are: CHANGE RELATED TO “MAN” CHANGE RELATED TO “MACHINE” CHANGE RELATED TO “METHOD” CHANGE RELATED TO “METERIAL” ENGINEERING CHANGES MANUFACTURING LOCATION CHANGE REASONS FOR CHANGES DOCUMENTS SUBMISSION AGAINST 4M CHANGE Following document are generally submitted to customer

4M Change Types | Engineering Changes | Reasons for Change Read More »

Social Share Buttons and Icons powered by Ultimatelysocial
Pinterest
Pinterest
fb-share-icon